22.08.2019
Technical report on public response to the Dynamap System
Consegna C1 – Technical report on public response to the Dynamap System
Consegna C1 – Technical report on public response to the Dynamap System
Consegna B8 – Future system upgrade and analysis of the potential integration of further environmental parameters
Consegna D2 –Ā Proceedings of Dynamap special session II
Consegna B3 – Report describing the ANED algorithms for low and high computation capacity sensors
Consegna B1 – Sizing the monitoring network – Technical report
Consegna B4 -Dynamap GIS based software for real time noise maps update
Consegna A1 – Report on the state of the art of dynamic noise mapping
Consegna A2 – Technical report on pilot areas location